Besuchszeiten09:30 AM06:00 PM
Dienstag, Januar 13, 2026
Tower Bridge Rd, London SE1 2UP, Vereinigtes Königreich
Zurück zu history
conservation

Tower Bridge Maintenance – Steel, Hydraulics & Paint

A practical overview of how the bridge is kept safe and beautiful: inspections, corrosion control, and hydraulic servicing.

11/26/2025
12 min read
Tower stone and metal detail suitable for inspection

Routine Tasks

  • Structural Inspections: Check rivets, plates, and fatigue.
  • Hydraulic Service: Monitor pressure, leaks, seals.
  • Paint Cycles: Anti-corrosion primers + topcoats.
  • Deck & Walkways: Surface care, drainage clear.

Conservation Ethic

Minimal intervention, thorough documentation, and reversibility guide modern practice.


Image Highlights

Edge and frame details Walkway interior corridor Close-up painted steel


Maintenance Matrix

Area Task Frequency Notes
Steelwork Visual + NDT sampling Annual / multi-year UT/MT where indicated
Hydraulics Pressure, seals, fluids Scheduled OEM tolerances
Paint Spot repair; full cycles Multi-year Primer + mid + top
Walkways Surface, drainage Seasonal Slip resistance checks

Paint System (Typical)

  • Surface prep to standard (e.g., Sa 2½ equivalent).
  • Zinc-rich primer → epoxy mid-coat → polyurethane topcoat.
  • Colorways maintain the heritage palette.

Lifecycle View

Small, predictive interventions avoid expensive overhauls. Sensor data and inspections create a condition-based plan.

Bottom Line

Maintenance preserves both movement and memory—mechanics and masonry need equal care.

Über den Autor

Conservation Notes Editor

Conservation Notes Editor

Ich habe das gebaut, um Tower Bridge smart zu erleben — klares Tempo, besseres Timing und Kontext, der jeden Niet und Mechanismus bedeutsam macht.

Tags

maintenance
inspection
hydraulics
paint
walkways

Comments (0)

Leave a Comment

Loading comments...