Jadwal kunjungan09:30 AM06:00 PM
Selasa, Januari 13, 2026
Tower Bridge Rd, London SE1 2UP, Britania Raya
Kembali ke history
conservation

Tower Bridge Maintenance – Steel, Hydraulics & Paint

A practical overview of how the bridge is kept safe and beautiful: inspections, corrosion control, and hydraulic servicing.

11/26/2025
12 min read
Tower stone and metal detail suitable for inspection

Routine Tasks

  • Structural Inspections: Check rivets, plates, and fatigue.
  • Hydraulic Service: Monitor pressure, leaks, seals.
  • Paint Cycles: Anti-corrosion primers + topcoats.
  • Deck & Walkways: Surface care, drainage clear.

Conservation Ethic

Minimal intervention, thorough documentation, and reversibility guide modern practice.


Image Highlights

Edge and frame details Walkway interior corridor Close-up painted steel


Maintenance Matrix

Area Task Frequency Notes
Steelwork Visual + NDT sampling Annual / multi-year UT/MT where indicated
Hydraulics Pressure, seals, fluids Scheduled OEM tolerances
Paint Spot repair; full cycles Multi-year Primer + mid + top
Walkways Surface, drainage Seasonal Slip resistance checks

Paint System (Typical)

  • Surface prep to standard (e.g., Sa 2½ equivalent).
  • Zinc-rich primer → epoxy mid-coat → polyurethane topcoat.
  • Colorways maintain the heritage palette.

Lifecycle View

Small, predictive interventions avoid expensive overhauls. Sensor data and inspections create a condition-based plan.

Bottom Line

Maintenance preserves both movement and memory—mechanics and masonry need equal care.

Tentang Penulis

Conservation Notes Editor

Conservation Notes Editor

Kami menyusun panduan ini agar Anda menikmati Tower Bridge dengan cerdas — tempo jelas, waktu lebih tepat, dan konteks yang membuat setiap paku keling dan mekanisme terangkat bermakna.

Tags

maintenance
inspection
hydraulics
paint
walkways

Comments (0)

Leave a Comment

Loading comments...