Besökstidtabell09:30 AM06:00 PM
Tisdag, Januari 13, 2026
Tower Bridge Rd, London SE1 2UP, Storbritannien
Tillbaka till useful info
operations

London Bridge Gates – Safety & Opening Protocols

Understand the choreography of gates, barriers, and signals that makes bascule openings safe and punctual.

11/26/2025
12 min read
Road gates and barriers on bridge approach

Opening Choreography

  • Advance Notices: River schedules booked in advance.
  • Road Barriers: Lowered to clear vehicles.
  • Pedestrian Gates: Secured; marshals guide visitors.
  • Signals & Bells: Warn of imminent lift.

Safety Layers

Layer Purpose
Physical Barriers Prevent approach
Audible Signals Time awareness
Visual Lights Clear status

Image Highlights

Gates close-up Empty road before lift Traffic managed


Timeline of a Lift (Indicative)

  1. River vessel confirms booking window on approach.
  2. Control room arms signals; road barriers lower.
  3. Pedestrian marshals sweep the deck; announcements play.
  4. Bascule area cleared; interlocks verify safe state.
  5. Hydraulics engage; bridge raises; vessel transits.
  6. Descent, interlocks clear; barriers open; normal traffic resumes.

Roles & Redundancies

  • Control: procedures, comms, overrides.
  • Marshals: physical checks, public guidance.
  • Interlocks: prevent actuation with unsafe states.
  • Redundancy: manual overrides and abort criteria in adverse weather.

Weather & Exceptional Conditions

High winds, reduced visibility, or unusual river flow can delay lifts. Safety and navigational clarity take precedence.

Bottom Line

Gates coordinate a moment of transformation: the road becomes river, then returns.

Om författaren

Operations Explainer

Operations Explainer

Skapad för smart upplevelse med kontext.

Tags

gates
operations
signals
safety
river traffic

Comments (0)

Leave a Comment

Loading comments...